3.1 Initial start-up
■■■■■■■■■■■■■■■■■■■■■■
66
■■■■■■■■
850 Professional IC – AnCat – MCS
3 Start-up
The chapter Start-up is divided into 2 sections:
Initial start-up The initial start-up is carried out during the ini-
tial installation.
Conditioning Conditioning is carried out as a final installation
step and each time after the system is started.
3.1 Initial start-up
The initial start-up is carried out during the initial installation. The entire
system is flushed before guard column and separation column are instal-
led.
Caution
The separation column and guard column may not be installed for the
initial start-up.
Make sure that the 6.2744.040 coupling is being used instead of the
columns.
Perform the following steps during the initial start-up:
1
Preparing the software
Start the PC program MagIC Net.
Open the Equilibration tab in MagIC Net.
Select (or create) a suitable method.
2
Preparing the instrument
Ensure that the eluent aspiration tubing is immersed in the eluent
and that there is enough eluent in the eluent bottle.
Switch on the instrument.
3
Deaerating the high pressure pump
Deaerate the high pressure pump(s) via the purge valve (see
Chapter 2.10.2, page 35).