Metrohm 792 Basic IC User Manual Page 50

  • Download
  • Add to my manuals
  • Print
  • Page
    / 197
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 49
2.9 Putting into operation
792 Basic IC
41
2.9 Putting into operation
2.9.1 Putting into operation without suppressor
Before sample solutions can be injected at the
792
Basic IC
(without
use of the suppressor), the entire system must be tested for leaks and
then conditioned with eluent until the baseline is stable. Proceed as fol-
lows:
1 System öffnen
x
Start the
«
792 Basic IC
»
PC program, if it has not already
been started (see
section 2.5.3
).
x
Select
File / Open / System
in the main window. Select the sys-
tem file suited for the inserted column (e.g.
anionsupp.smt
)
and click on
<Open>
.
2 Open control window
x
Double-click the 792 icon in the system window. The control
window for manual control of the 792 Basic IC appears, which
indicates conductivity, pressure and current system parame-
ters.
3 Start system
x
Make sure, that the aspirating tubing 6.1834.010 for the high-
pressure pump is immersed in the eluent.
x
Select
Startup hardware (Measure baseline)
from the
Control
menu in the system window. The high-pressure pump is
started, at the same time, a chromatogram window is opened
where the baseline is recorded continuously.
Page view 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 196 197

Comments to this Manuals

No comments