Metrohm 874 USB Oven Sample Processor User Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 79
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
874 Oven Sample Processor
■■■■■■■■
19
1
1
2
2
3
3
4
6.1805.0106.1805.010
6.1805.050
Figure 10 Mounting the tubings
Mount the FEP tubings as follows:
1
Load the two drying flasks that have been prepared into the holders,
see previous illustration.
2
Screw one 6.1805.050 FEP tubing (18 cm length) to the gas out-
let (left-hand side of the tower, labeled to). Screw the other tubing
end on the front drying flask to the M6 connector without a dot
mark (see right-hand arrow).
3
Screw one 6.1805.010 FEP tubing (13 cm length) to the gas inlet
(left-hand side of the tower, labeled from). Screw the other tubing
end on the rear drying flask to the M6 connector with a dot mark
(see left-hand arrow).
4
Screw the second 6.1805.010 FEP tubing (13 cm length) tightly
onto the remaining M6 connectors of the drying flasks.
The marking Drying flask on the left-hand side of the tower dis-
plays the diagram for the tubing.
Note
Tighten the screw connections well by hand.
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 78 79

Comments to this Manuals

No comments